Skip to content

Energy Modernization for Homeowners Associations — Reduce Your Building's Expenses with Government Support

Your own solar power plant for an apartment building means real savings on maintenance. Using your own power generation to run elevators, pumps, and lighting significantly cuts expenses from the homeowners association's budget — lowering residents' bills as a result. Thanks to government compensation programs, part of the equipment cost is covered by the fund, not the residents.

Advantages for your homeowners association with ЕКОТЕХ КО:

Help with compensation:

We prepare the entire technical document package required to receive government payments.

Direct equipment imports:

We work directly with top-tier European brands. This ensures the lowest possible price for your budget estimate, along with the certificates required by banks and funds.

Professional engineering calculations:

We take into account your building's specifics, elevator startup currents, and the condition of internal networks to ensure safe system operation.

Програма SvitloDIM for Kyiv and the region:

State compensation of up to 70% of the cost

Today, homeowners associations can take advantage of the most favorable terms yet for switching to their own power generation. Through the Energy Efficiency Fund, you can receive a grant that covers part of the equipment costs. Ecotech Ko handles all the technical support so your building can secure its payout.

How we help your homeowners association get a grant:

1. Professional energy audit:

We inspect the building's engineering systems and prepare the technical justification for the Fund.

2. Selection of certified equipment:

We use inverters and batteries (Deye, Sunwoda) that meet all the requirements of the SvitloDIM program.

3. Documentation support:

We compile the complete document package (passports, cost estimates, acts) for submitting the application and reporting on fund usage.

4. Turnkey installation:

We install the system so it runs at 100% capacity and passes inspection by regulatory authorities.

The loan amount depends on the number of floors:

The larger the building, the greater the possible funding amount.

up to 6 floors UAH 100,000 up to 6 floors UAH 100,000
7-16 floors UAH 200,000 7-16 floors UAH 200,000
17 floors UAH 300,000 17 floors UAH 300,000

*also for buildings with attached, built-in, or rooftop boiler rooms and for buildings from 4 to 16 floors (inclusive) with 3 or more entrances/stairwells.

Equipment package for your building

Longi LR8-66HGD-615

Longi LR8-66HGD-615

  • Monocrystalline bifacial solar panel
  • Power output: 615 W
  • Module efficiency: 22.6%
Sunwoda Atrix-5

Sunwoda Atrix-5

  • Monocrystalline bifacial solar panel
  • Power output: 615 W
  • Module efficiency: 22.6%
  • Rack-mounted lithium-ion battery
  • Capacity: 5.12 kWh
  • Life cycle: 6000
Sunwoda Battery Module (5Kwh)

Sunwoda Battery Module (5Kwh)

  • Monocrystalline bifacial solar panel
  • Power output: 615 W
  • Module efficiency: 22.6%
  • A modern LiFePO₄ module designed for energy storage in residential and commercial energy storage systems
  • High level of safety (SOC and fault-status indication, protection against under-voltage during discharge, overcurrent, overheating, and short circuits)
Sunwoda BMS Sunwoda CIESS-R-S

Sunwoda BMS Sunwoda CIESS-R-S

  • Monocrystalline bifacial solar panel
  • Power output: 615 W
  • Module efficiency: 22.6%
  • A battery management unit used for energy storage systems
  • Real-time operation monitoring
  • Active cell balancing

* The quantity and specifications of the equipment are calculated individually based on the needs of the homeowners association and the system's capacity.

Savings every resident will feel

Savings every resident will feel

1. Noticeably lower bills for common-area electricity: solar energy fully covers lighting for stairwells, parking areas, and the surrounding grounds.

2. Independence during blackouts: the building keeps its lights, elevators, and water supply running during outages.

3. Increased property value: an apartment in an energy-independent building with solar panels and working elevators sells for 10-15% more on the real estate market.

We handle the bureaucracy for you

Technical inspection

We survey the roof and assess the electrical network.

Technical inspection

Documentation support

We prepare the feasibility study (TEO) and the facility's technical passport for the Energy Efficiency Fund.

Documentation support

Installation and service

We install the equipment to program standards and provide ongoing warranty support.

Installation and service

Питання та відповіді

Who pays for the installation?

Initially, the homeowners association funds the project (using its own funds or a preferential loan), and once the work is complete, the Energy Efficiency Fund pays up to 70% compensation into the homeowners association's account.

Can panels be installed on a flat roof?

Yes, we use ballasted mounting systems. These are heavy supports that hold the panels securely in place without a single roof penetration, keeping it fully watertight.

Will there be enough power for the elevators?

We select industrial inverters with high peak output that start elevator motors easily, without any glitches.

What equipment is included in the program?

Inverters, batteries, solar panels

Companies We Work With

Get a Detailed Consultation

Call us or reach out any way that's convenient for you

+380 67 547 29 20 +380 67 326 88 87 +380 67 469 65 34
Online Daily from 9:00 AM to 6:00 PM

Or ask a question online

Leave your phone number and we will contact you

Useful info about solar energy