Turnkey solar power plant installation at your site
We install turnkey solar power plants: we bring our own tools, install the equipment, and get it up and running. You receive equipment that is ready for use.
Why is this important?
Why not order it online yourself? Is it really that hard to set everything up on your own?
It’s a question we hear almost every day. And just as often, we hear requests to “help, figure it out, and offer advice.”
To properly handle the installation on your own, you need to have suitable transportation to deliver the equipment. Unforeseen situations can arise along the way—for example, an important part might go missing. Who will be held responsible for this?
Just one small mistake in the connection procedure—and the entire system could fail or malfunction.
When you contact our company, we take full responsibility for everything—from the initial project design to tightening the very last screw. We handle the delivery, shipping, and assembly ourselves.
Once it’s installed and connected, we’ll show you how to monitor and use the SES via the smartphone app.
What's included in the service
We identify the client’s needs and select equipment options accordingly.
A specialist visits the site to conduct a study on electricity consumption and planned generation.
We prepare the necessary documents, including a detailed layout and connection plan.
We deliver equipment to the customer’s site using our own vehicles. Our work crews will arrive at your location with all the necessary technical equipment.
Unloading and setting up the equipment, connecting it, and putting it into operation.
At the end of the installation, we always conduct a final inspection and provide a consultation for the customer. We then remain available for technical support and maintenance.
Why us?
- Teams of in-house specialists with over 5 years of experience
- In-house logistics, including specialized transport for the safe shipment of equipment
- Using professional tools for system installation
- Equipment for inspecting, monitoring voltage, and testing all equipment in the circuit
Questions and Answers
How long does the installation take?
Depending on the complexity of the installation and the number of devices, the installation process can take anywhere from 1 hour to several days or even weeks.
Who performs the installation work?
Our work brigades will come to your site. They are our full-time employees, not contractors. Therefore, all issues are resolved directly.
If you encounter any problems during installation, what should you do?
If our team performed the installation, this is highly unlikely. However, if an unforeseen issue arises, please contact us—we will come and fix it. If the problem is due to a manufacturing defect, we will replace the part with a new one.







